Load Bank on a Rent
It is termed as a Load Bank as a Service (LBAAS).
The
proposals are worked out for a minimum of three months’ test
duration. The price may be reduced if testing duration is
increased.
The
loading, unloading and transport charges are in our scope.
Please note that these prices are site location specific.
The cost
of any damage due to our personnel to the vehicle or load
bank is in our scope. But if customer personnel are involved
in any damage to the vehicle or load bank, the cost will be
borne by the customer
The cost
of the cable which is to be used for connection of load bank
with customer equipment is in our scope.
The cost
of connection accessories, if any, for connecting the load
bank to the customer’s equipment is not in our scope. will
be informed in advance.
The cost
of Maintenance/Troubleshooting of a load bank is in our
scope. The Maintenance/Inspection/Troubleshooting will be
carried out by our personnel before starting testing on a
new site. This cost involves labor as well as material cost.
The
lodging/boarding of our personnel is in our scope.
A single
PO with 3 months duration is mandatory for the customer.
The
Junction boxes required for connection of Aux Supply to all
load banks is in our scope.
The
central Consoles required for networking of multiple load
banks is in our scope.
The
MODBUS/ETHERNET Cables required for networking of load banks
is in our scope.
The
expense of deputation of Technicians onsite during testing
is in our scope.


